The MB-S18 S3 Screening Buckets are suitable for excavators from 20 to 35 ton.
MB Crusher has supplied a total of 13 MB-S18 S3 Screening Buckets on the development of the South Caucasus Pipeline (SCP).
The 692km South Caucasus Pipeline has been designed to transport gas from the Shah Deniz field in the Azerbaijan sector of the Caspian Sea, through Georgia and on to the Georgia-Turkey border.
At full capacity, and after additional stages of development, it is envisaged that the pipeline will export up to 25 billion m³ of gas a year. The expanded SCP system will tie into the Trans Anatolian Pipeline (TANAP) at the Eastern Turkey border which, in turn, will connect with the Trans Adriatic Pipeline (TAP) at the Western Turkey border some 1 900km away. TAP crosses Greece and Albania, from where it continues under the Adriatic Sea to Southern Italy. The total length of TAP is about 870km.
The MB-S18 S3 Screening Buckets, suitable for excavators from 20 to 35 ton, allow for direct reuse of recovered materials, particularly useful in road building, construction and maintenance of pipelines.
MB-S18 S3 Screening Buckets can be used with the magnet and the nebuliser kit to increase versatility for the separation of iron. This also allows them to be deployed in inhabited areas due to sound suppression of dust.
MB Screening Buckets are said to be ideal for screening material, both before and after the crushing phase. Equipped with baskets formed by interchangeable modular panels, available with different size holes, depending on the needs of the job, the easy assembly and disassembly of the panels makes for quick change to obtain different output material.
The unique and innovative conical shape of the drum is specially designed to significantly increase the hourly production performance and to screen all the collected material, residue-free.